Review current ETL processes – A DataStage extract from current Oracle DW to Netezza has been partially developed for the historical one-time dataload. This process needs to be reviewed and possibly leveraged to create daily delta loads from Oracle DW to Netezza.
Develop one-time ETL extract for historical data – Would like to leverage any coding from Task #1 and/or develop new DataStage coding to develor and finalize the one-time historical data extract from the Oracle DW. It is required that approximately 2000 tables across 9 different schemas be loaded into Netezza.
Develop logic for the Materialized Views within Netezza – There are approximately 200 Oracle MV’s that must be redesigned on the Netezza platform.
Develop nightly ETL extracts from Oracle DW to Netezza – Need to develop nightly extracts using the Oracle DW as an interim data source. A future phase will be required to extract this data from the original source systems once the Oracle DW has been decommissioned and ETBF converted to Oracle EBS.
Develop nightly extracts from Oracle EBS to Netezza – There are approximately 30 tables that must be sourced directly from Oracle EBS for the scope of this phase of the project.
Develop data loads from Netezza Prod to Netezza test – It is required that the production Netezza data is also loaded onto the Netezza test appliance for DR and failover purposes.
Additional Information
All your information will be kept confidential according to EEO guidelines.